Custom Heat Exchanger Manufacturer for Injection Molding Machines
JED manufactures custom heat exchangers and oil coolers for injection molding machine manufacturers.
Built to approved drawings for machine integration, batch supply and replacement requirements, with materials, connections and mounting dimensions matched to your equipment.
Heat Exchangers and Coolers We Supply
Two cooler configurations for integration into your machine’s hydraulic oil system.
Engineering Review Before Manufacturing
Our engineers work with your team to confirm the manufacturing requirements.
- Define the Starting Point: Review the available drawing, technical specification, existing unit information, or operating data.
- Confirm the Cooling Requirements: Check the working media, cooling duty, flow rates, inlet and outlet temperatures, and operating pressures.
- Review the Product Configuration: Confirm the heat exchanger type, materials, connections, installation space, and applicable inspection requirements.
- Approve the Manufacturing Documents: Production begins after the required technical details and manufacturing drawings have been reviewed and approved.
Built to Drawings for Batch Supply and Replacement
We support production orders for machine manufacturers and replacement coolers for existing equipment.
For Machine Manufacturers
Batch and repeat orders follow the confirmed drawing revision and order specifications. Please send the available:
- Cooler drawing and machine model
- Operating conditions and installation details
- Material and inspection requirements
- Initial quantity and expected repeat demand
For Replacement Coolers
An initial review can begin with the information available from your existing unit. Please send the available:
- Original drawing or cooler nameplate
- Photos and overall dimensions
- Connection sizes and mounting positions
- Operating conditions and replacement quantity
Send the information you already have. We will identify any details needed to complete the quotation and manufacturing review.
Manufacturing, Inspection and Certifications
Our management systems are certified to ISO 9001:2015, ISO 14001:2015, and ISO 45001:2018. Applicable Pressure Vessel, CCS, and ASME certification documents can be reviewed according to project requirements. VT, UT, and PT inspection by qualified personnel is available when specified.
Production Control
Materials, connections, critical dimensions, and assembly requirements are according to the approved manufacturing documents.
Inspection and Testing
Overall dimensions, mounting points, connection positions , and pressure or leakage testingare checked before shipment.
Project Documentation
Material certificates, inspection records, test reports, and other required documents are prepared according to the confirmed order .
Send Your Injection Molding Cooler Requirements
Send your available drawing, operating data, existing cooler photos, installation dimensions, or inspection specifications.
Our team will review the heat exchanger type, thermal requirements, materials, connections, and documentation scope with your engineers before quotation.
*Your files will be used only for project evaluation and technical review.
FAQ
It may be possible if the cooling duty, fluid conditions and installation interfaces are compatible. Each machine’s operating requirements should be checked before adopting a common cooler drawing.
Yes. Photos, nameplate details and measured dimensions can support an initial review. Critical interfaces and operating requirements must be confirmed before a replacement manufacturing drawing is approved.
Changes can be reviewed against the working fluids, pressures, cooling conditions and installation limits. Any agreed changes are recorded in the manufacturing drawing and order specifications.
The cooler construction, materials, production requirements and inspection scope affect the quotation and schedule. Send your initial quantity, expected repeat demand and required delivery date for review.